Thank you for subscribing to our newsletter.

Newsletter Signup

Please check the errors in the form and fill the required fields with *

close-button
Hero

Marina Construction & Commissioning

As the project moves into the marina construction phase, we compile detailed engineering and works drawings. Load calculations are undertaken for the mooring systems, and full specifications drawn up for utilities and ancillary services. We also address potential marina planning issues and identify the right qualified contractors for the job.

Our project planning and management services take the project from signed-off plans through the tender process to a completed marina.

On completion of works, we oversee the testing and approval of all facilities and systems and ensure the marina is fully prepared to start operation. At this point we can either hand over to the client’s team to run the marina, or provide our own turnkey management services.

Services:
  • Detailed technical marina design
  • Specification of operational buildings, equipment, utilities and ancillary services
  • Requirements for technical, maintenance and boat storage facilities
  • Environmental impact assessments
  • Legislative advice
  • Contractor tendering and selection
  • On-site monitoring of progress and expenditure
  • Testing and approval of facilities and systems
case study

Case Study – St Katharine Docks

Flexible berth layout provides a maritime centre for international events based in London

case study

Case Study – Cesme Marina

Winner of 2014 PIANC Marina Excellence Design Jack Nichol Award

case study

Case Study – Port Louis Marina

Transformed a wreck-strewn lagoon into the south Caribbean’s finest marina

case study

Case Study – Limassol Marina

Integrated a 520 berth marina with a shoreside commercial zone that redefined the city waterfront

case study

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

case study

Case Study – Dubai Harbour

Largest maritime and leisure hub in the Middle East designed by Camper & Nicholsons Marinas

case study

Case Study – Sanya Marina

Increased revenue from an improved berth mix

case study

Case Study – Yas Marina

We grew annual occupancy from 13% to 87% in under 3 years and hosted five F1 Grand Prix events

Sign Up For Our Wavelength Newsletter