Thank you for subscribing to our newsletter.

加入通讯

Please check the errors in the form and fill the required fields with *

close-button
Hero

Case Study – Yas Marina

We grew annual occupancy from 13% to 87% in under 3 years and hosted five F1 Grand Prix events

About

Located at the heart of the Yas Marina Formula 1 circuit, this high profile facility was built by Aldar Marinas under the ownership of the Abu Dhabi Executive Affairs Authority.

Camper & Nicholsons Marinas was asked to perform a full operational audit, which was conducted by senior personnel from all departments, involving a series of site visits followed by the submission of a detailed report.

The Abu Dhabi Executive Affairs Authority subsequently appointed Camper & Nicholsons Marinas for the full operational term management of Yas Marina.

Gallery
Added value:
  • Greater operational efficiencies introduced
  • Improved management systems and protocols
  • Increased and diversified sales & marketing through C&N’s international network
  • Year on year increases in occupancy
  • First marina worldwide capable of providing 1,000 amperes 3 phase shore power
Capital cost and financial implications:
  • Expansion of facilities in 2013 developed in a considered manner with a reduction in GFA for the marina service functions
  • New marina berths added at 60% of the original development costs

For a list of our current and recent marina planning, design, consultancy, development projects around the world, click here.

case study

Case Study – Sanya Marina

Increased revenue from an improved berth mix

case study

Case Study – Dubai Harbour

Largest maritime and leisure hub in the Middle East designed by Camper & Nicholsons Marinas

case study

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

case study

Case Study – Limassol Marina

Integrated a 520 berth marina with a shoreside commercial zone that redefined the city waterfront

case study

Case Study – Port Louis Marina

Transformed a wreck-strewn lagoon into the south Caribbean’s finest marina

case study

Case Study – Cesme Marina

Winner of 2014 PIANC Marina Excellence Design Jack Nichol Award

case study

Case Study – St Katharine Docks

Flexible berth layout provides a maritime centre for international events based in London

case study

Case Study – Yas Marina

We grew annual occupancy from 13% to 87% in under 3 years and hosted five F1 Grand Prix events

注册我们的通讯